The professional PV mounting systems South & East-West for flat roofs

The TRITEC PMT EVO 2.0 flat roof system is characterized by the shortest installation time and high stability. The innovative click technology ensures speedy construction, and the short click components facilitate handling during the installation. Additionally, they provide the required measure for the position of the individual components. Time-consuming measurements within the system are thus unnecessary, and errors in construction are prevented since the click connections are matched.

Flat roof East-West

PMT EVO 2.0 Mounting System 1

Flat roof South

PMT EVO 2.0 Mounting System 1

Easy to handle

For the entire installation, no sharp small parts are used, such as drilling screws. Also, thanks to no-drill mounting, there will be no sharp metal swarf or filings, which might damage the delicate roof covering. The load transferring composite system of extra-wide support surfaces of the bottom rails, the cube and the base is reinforced by multifunctional cross bracing to maximize the system stability.

Shortest installation time

  • Very small number of components
  • Roof connection without roof penetration
  • Innovative click technology
  • Manageable and handy components for easy and swift handling during installation
  • Even after the system installation, cables may be laid without any additional expenditure

Stability and safety

  • Optimum load distribution and introduction by means of a 150 mm wide support surface of the basic structure on the roof covering
  • Premounted sandwich-type protective building mat (11 mm) fixed to the system to protect the roof covering and to protect against plasticizer migration
  • Unobstructed roof drainage according to DIN 1986-100 by means of partially applied 11-mm thick protective building mat
  • Optimized rear ventilation for maximum energy yield
  • No load transmission via the PV module in longitudinal and/or transverse direction
  • Ballast reduction thanks to aerodynamically optimized construction and the implementation of the latest research findings from system and ballast design software
  • Tested by the independent institute for industrial aerodynamics in the boundary layer wind tunnel according to German and U.S. standards (in compliance with ASCE 7-05, ASCE 7-10 and SEAOC PV 2-2012

TIENES PREGUNTAS?

¡Contáctanos!

Estaremos encantados de ayudarle y de encontrar la solución adecuada para usted.