Installations with up to 10 kWp
Detached Family House, Allschwil BL (Switzerland)
|
|
|
Installed power
|
10.92 kWp
|
|
Solar modules
|
84 units Kyocera KC130GHT-2
|
|
Inverters
|
3 units Kyocera KC3.6i
1 unit Kyocera KC1.8i |
|
Mounting system
|
AluStand
|
|
CO2 saving/year
|
4.8 tons
|
|
Energy yield
|
Approx. 9,555 kWh/year
|
|
Commissioning
|
4 October 2007
|
|
Distributor
|
TRITEC Group
|
|
Planner/Installer
|
TRITEC AG Schweiz, Zweigniederlassung Aarberg
|
|
Operator
|
Family Ehrbar, Allschwil
|
Detached Family House Eberenz, Biel-Benken (Switzerland)
|
|
Installed power
|
9.25 kWp
|
|
Solar modules
|
35 units MegaSlate 136 W
51 units special modules |
|
Inverters
|
2 units SolarMax 4000C
1 unit SolarMax 3000S |
|
Mounting system
|
MegaSlate 3S (roof integration)
|
|
CO2 savings/year
|
3.8 tons
|
|
Energy yield
|
Approx. 7,600 kWh/year
|
|
Commissioning
|
20th June 2008
|
|
Distributor
|
TRITEC Group
|
|
Planner/Installer
|
TRITEC AG Schweiz
Zweigniederlassung Aarberg |
|
Operator
|
The Eberenz Family, Biel-Benken
|
Detached Family House Neuffer, Deckenpfronn (Germany)
|
|
Installed power
|
9.23 kWp
|
|
Solar modules
|
45 units Kyocera KD205GH-2P
|
|
Inverter
|
1 unit TRI-Xi 10.0
|
|
Mounting system
|
TRI-STAND
|
|
CO2 savings/year
|
6.5 tons
|
|
Energy yield
|
Approx. 9,300 kWh/year
|
|
Commissioning
|
30th July 2009
|
|
Distributor
|
TRITEC Group
|
|
Technical support
|
TRITEC Deutschland GmbH
|
|
Planner / Installer
|
Elektro Walz, Deckenpfronn
|
|
Operator
|
E. Neuffer
|
Detached Family House, Falkenstein (Germany)
|
|
Installed power
|
7.35 kWp
|
|
Solar modules
|
35 units Kyocera KD210GH-2PU
|
|
Inverter
|
1 unit SolarMax 4200S
1 unit SolarMax 3000S |
|
Mounting system
|
TRI-STAND
|
|
CO2 savings/year
|
2.9 tons
|
|
Energy yield
|
Approx. 5,950 kWh/year
|
|
Commissioning
|
14th July 2009
|
|
Distributor
|
TRITEC Group
|
|
Technical support
|
TRITEC Deutschland GmbH
|
|
Planner / Installer
|
FAMOS
|
|
Operator
|
Private operator
|
Detached Family House Hopman, Mahlberg (Germany)
|
|
|
Installed power
|
6.72 kWp
|
|
Solar modules
|
32 units Kyocera KD210GH-2PU
|
|
Inverters
|
2 units SMA SB 3000TL-20
|
|
Mounting system
|
TRI-STAND
|
|
CO2 savings/year
|
4.6 tons
|
|
Energy yield
|
6,552 kWh/year
|
|
Commissioning
|
1st June 2009
|
|
Distributor
|
TRITEC Group
|
|
Planner / Installer
|
TRITEC Deutschland GmbH
|
|
Operator
|
The Hopman Family, Mahlberg
|
|
|
|
|
Monitoring
|
Petrofer AG, Reinach (Switzerland)
|
|
Installed power
|
6 kWp
|
|
Solar modules
|
16 units Kyocera KC175GHT-2 (front)
16 units Kyocera KC200GHT-2 (flat roof) |
|
Inverters
|
2 units SolarMax 3000S
|
|
Mounting system
|
AluStand
|
|
CO2 savings/year
|
2.8 tons
|
|
Energy yield
|
Approx. 5,630 kWh/year
|
|
Commissioning
|
16th May 2008
|
|
Distributor
|
TRITEC Group
|
|
Planner/Installer
|
TRITEC AG Schweiz
Zweigniederlassung Aarberg |
|
Operator
|
Petrofer AG, Reinach
|
Detached Family House, Rüti (Switzerland)
|
|
|
Installed power
|
5.95 kWp
|
|
Solar modules
|
35 units Schott Solar ASE 165-GT-FT/MC 170 Wp
|
|
Inverters
|
2 units SolarMax 3000S
|
|
Mounting system
|
AluStand
|
|
CO2 savings/year
|
2.9 tons
|
|
Energy yield
|
5,900 kWh/year
|
|
Commissioning
|
10 July 2008
|
|
Distributor
|
TRITEC Group
|
|
Planner/Installer
|
LEAB AG – Qualified installer of TRITEC AG Schweiz
|
|
Operator
|
Private operator
|
Farmer H. Bauer, Gechingen (Germany)
|
|
Installed power
|
5.7 kWp
|
|
Solar modules
|
60 units Schott ASI 95
|
|
Inverter
|
1 unit SMA SMC 5000A
|
|
Mounting system
|
TRI-VENT
|
|
CO2 savings/year
|
3.8 tons
|
|
Energy yield
|
5,415 kWh/year
|
|
Commissioning
|
July 2009
|
|
Distributor
|
TRITEC Group
|
|
Planner
|
TRITEC Deutschland GmbH
|
|
Installer
|
Elektro Walz, Deckenpfronn
|
|
Operator
|
Farmer H. Bauer
|
Roof-integrated System Family I. + V. Vanoli-Emenegger (Switzerland)
|
|
|
Installed power
|
5.7 kWp
|
|
Solar modules
|
24 units customised laminates with the cells Kyocera PSC100
|
|
Inverters
|
2 units Convert 4000
|
|
Energy yield
|
4,500 kWh/year
|
|
Commissioning
|
28th February 2000
|
|
Distributor
|
TRITEC Group
|
|
Installer
|
TRITEC AG (Switzerland)
|
|
Operator
|
Fam. Vanoli-Emenegger
|
Tracker, Wilchingen (Switzerland)
|
|
Installed power
|
5.44 kWp
|
|
Solar modules
|
32 units Schott Solar
Schott Poly 170 |
|
Inverters
|
2 units SolarMax 3000S
|
|
Mounting system
|
Biaxial tracker from SolarTrack
|
|
CO2 savings/year
|
3.6 tons
|
|
Energy yield
|
Approx. 7,200 kWh/year
|
|
Commissioning
|
1st December 2008
|
|
Distributor
|
TRITEC Group
|
|
Planner/Installer
|
Solarbau Lowel GmbH
|
|
Operator
|
Private operator
|
EWZ Energy Service Provider Zermatt (Switzerland)
|
|
| Installed power | 4.76 kWp |
| Solar modules | 28 units Kyocera KC170GHT-2 |
| Inverters |
1 unit SolarMax 3000C
1 unit SolarMax 2000C |
| Mounting system | Halfenschienen-System in combination with AluStand, elevated |
| Energy yield | 5,145 kWh/year |
| Commissioning | 27th May 2005 |
| Distributor | TRITEC Group |
| Installer | TRITEC AG Schweiz, Zweigniederlassung Aarberg |
| Operator | EWZ Energy Service Provider Zermatt, Switzerland |
Detached Family House, Bad Sobernheim (Germany)
|
|
|
Installed power
|
4.59 kWp
|
|
Solar modules
|
27 units Schott Solar Schott Poly 170
|
|
Inverter
|
SMA SB 4000TL-20
|
|
Mounting system
|
AluStand
|
|
CO2 savings/year
|
2.9 tons
|
|
Energy yield
|
4,360 kWh/year
|
|
Commissioning
|
18 August 2008
|
|
Distributor
|
TRITEC Group
|
|
Planner/Installer
|
SolarCelsius OHG
|
|
Operator
|
Private operator
|
Saddleback-roof Installation Family Wilde (Switzerland)
|
| Installed power | 4.5 kWp |
| Solar modules | 27 units Kyocera KC167G-2 |
| Inverter | 1 unit SolarMax 4000/E |
| Mounting system | AluStand |
| Energy yield | 3,788 kWh/year |
| Commissioning | January 2004 |
| Distributor | TRITEC Group |
| Installer | TRITEC AG (Switzerland) |
| Operator | Family Wilde, Riehen (BS), Switzerland |
Garage Building Christ, Biel (Switzerland)
|
| Installed power | 4.31 kWp |
| Solar modules | 21 units Kyocera KD205GH-2P |
| Inverters | 2 units SolarMax 2000S |
| Mounting system | AluStand |
| CO2 savings/year | 1.9 tons |
| Energy yield | Approx. 3,810 kWh/year |
| Commissioning | 11th June 2008 |
| Distributor | TRITEC Group |
| Planner/Installer |
TRITEC AG Schweiz
Zweigniederlassung Aarberg |
| Operator | The Christ Family, Biel |
Detached Family House Suter, Meilen (Switzerland)
|
| Installed power | 3.96 kWp |
| Solar modules |
18 units SolarWorld
Sunmodule+ SW 220 poly |
| Inverter | 1 unit SolarMax 4000C |
| Mounting system | AluStand |
| CO2 savings/year | 1.8 tons |
| Energy yield | Approx. 3,566 kWh/year |
| Commissioning | 28th April 2008 |
| Distributor | TRITEC Group |
| Planner/Installer |
TRITEC AG Schweiz
Zweigniederlassung Aarberg |
| Operator | The Suter Family, Meilen |
School Building Kappelenfeld, Hinterkappelen (Switzerland)
|
|
| Installed power | 3.9 kWp |
| Solar modules | 30 units Kyocera KC130GHT-2 |
| Inverter | 1 unit SolarMax 4000C |
| Mounting system | AluStand |
| CO2 savings/year | 1.8 tons |
| Energy yield | Approx. 3,666 kWh |
| Commissioning | 13 February 2008 |
| Distributor | TRITEC Group |
| Planner/Installer | TRITEC AG Schweiz, Zweigniederlassung Aarberg |
| Operator | SOKW Innerberg |
Detached Family House, Saint-Hippolyte (France)
|
| Installed power | 3 kWp |
| Solar modules | 18 units SolarWorld laminates SW 170 Wp |
| Inverter | SolarMax 3000S |
| Mounting system | Energy roof SolarWorld |
| CO2 savings/year | 1.2 tons |
| Energy yield | Approx. 3,500 kWh/year |
| Commissioning | March 2008 |
| Distributor | TRITEC Group |
| Planner | TRITEC France SARL |
| Installer | SARL Solaire du Roussillon |
| Operator | Private operator |
Detached Family House, Verdun-en-Lauragais (France)
|
| Installed power | 2.97 kWp |
| Solar modules |
18 units SolarWorld
Sunmodule+ SW 165 mono |
| Inverter | 1 unit SolarMax 3000S |
| Mounting system | Energy roof SolarWorld |
| CO2 savings/year | 1.2 tons |
| Energy yield | 3,543 kWh/year |
| Commissioning | February 2009 |
| Distributor | TRITEC Group |
| Planner | TRITEC France SARL |
| Installer | Phoebus Energies |
| Operator | Private operator |
Detached Family House, Interlaken (Switzerland)
|
|
| Installed power | 2.73 kWp |
| Solar modules | 21 units Kyocera FL130T-1A |
| Inverter | 1 unit SolarMax 3000S |
| Mounting system | Roof integration Solrif |
| CO2 saving/year | 1.3 tons |
| Energy yield | Approx. 2,590 kWh/year |
| Commissioning | 14 April 2008 |
| Distributer | TRITEC Group |
| Planner/Installer | TRITEC AG Schweiz, Zweigniederlassung Aarberg |
| Operator | Roland Burn, Interlaken |
Detached Family House, Provence (France)
|
|
Installed power
|
2.72 kWp
|
|
Solar modules
|
16 units SolarWorld Sunmodule+ SW 170 mono
|
|
Inverter
|
1 unit SMA SB 2500
|
|
Mounting system
|
SolarWorld energy roof
|
|
CO2 savings/year
|
1.1 tons
|
|
Energy yield
|
Approx. 3,250 kWh/year
|
|
Commissioning
|
August 2009
|
|
Distributor
|
TRITEC Group
|
|
Planner
|
TRITEC France SARL
|
|
Installer
|
Sarl Orcater
|
|
Operator
|
Private operator
|
Detached Family House, Roussillon (France)
|
| Installed power | 2.6 kWp |
| Solar modules | 20 units Kyocera FL130T-1A |
| Inverter | 1 unit SolarMax 3000S |
| Mounting system | Solrif |
| CO2 savings/year | 3.1 tons |
| Energy yield | 3,380 kWh/year |
| Commissioning | February 2008 |
| Distributor | TRITEC Group |
| Planner | TRITEC France SARL |
| Installer | Julien Cayla Consulting Sarl |
| Operator | Private operator |
Detached Family House, Lucca (Italy)
|
|
| Installed power | 2.4 kWp |
| Solar modules |
12 units Kyocera KC200GHT-2
|
| Inverter |
1 unit SolarMax 3000C
|
| Mounting system | AluTec CF |
| CO2 savings/year | 1.6 tons |
| Energy yield | 2,965 kWh/year |
| Commissioning | 21 January 2008 |
| Distributor | TRITEC Group |
| Planner/Installer | TRITEC Italia s.r.l. |
| Operator | Private operator |
Detached Family House, Saint Saturnin les Avignon (France)
|
| Installed power | 2.1 kWp |
| Solar modules | 16 units Kyocera FL130T-1A |
| Inverter | 1 unit SolarMax 3000S |
| Mounting system | Solrif |
| CO2 savings/year | 1 ton |
| Energy yield | Approx. 2,700 kWh/year |
| Commissioning | December 2008 |
| Distributor | TRITEC Group |
| Planner | TRITEC France SARL |
| Installer | Groupement PV Luberon |
| Operator | Private operator |
Alpine hut, Kuhn, Brissago (Switzerland)
|
|
| Installed power | 1.78 kWp |
| Solar modules | 12 units MegaSlate 148 Wp mono |
| Inverter |
1 unit SMA SB 1700 2 units SMA SI 5048 |
| Batteries |
24 units Hoppecke 16 OPzV solar.power 2000 Autonomy period: 2 weeks (summer) / 1 week (winter) |
| Mounting system | MegaSlate 3S (roof integration) |
| CO2 savings/year | 1.1 tons |
| Energy yield | Approx. 2,130 kWh/year |
| Commissioning | 13th November 2009 |
| Distributor | TRITEC Group |
| Planner/Installer | TRITEC AG Schweiz, Zweigniederlassung Aarberg |
| Operator | The Kuhn Family, Brissago |
Balcony of Detached Family House, Biel (Switzerland)
|
|
| Installed power | 1.76 kWp |
| Solar modules | 8 units SolarWorld Sunmodule+ SW 220 poly |
| Inverter | 1 unit Kyocera KC1.8i |
| Mounting system | AluTec CF / facade system |
| CO2 savings/year | 0.75 tons |
| Energy yield | Approx. 1,500 kWh |
| Commissioning | 14 January 2008 |
| Distributor | TRITEC Group |
| Planner/Installer | TRITEC AG Schweiz, Zweigniederlassung Aarberg |
| Operator | Oberli, Biel |
Ziteil Pilgrimage Church, Salouf GR (Switzerland)
|
| Installed power | 1.7 kWp |
| Solar modules | 16 units Kyocera LA721G108 |
| Battery | 8 days (autonomy period) |
| Mounting system | Own construction |
| Commissioning | February 1996 |
| Distributor | TRITEC Group |
| Planner/Installer | TRITEC AG |
| Operator | Salouf GR rectory |
Wyssen Avalanche Mast, Mattertal (Switzerland)
|
| Installed power | 36 Wp |
| Solar modules | 3 units SunWare 12/1 |
| Battery | Approx. 30 days (autonomy period) |
| Mounting system | Own construction |
| Commissioning | 20 November 2007 |
| Distributor | TRITEC Group |
| Planner | AlpuG GmbH |
| Installer | Wyssen Seilbahnen AG |
| Operator | Täsch municipality |