Project Abruzzo Pineto
Roseto, Pineto, Atri, Italy
| Fact Sheet | |
|---|---|
| System type | Freiland, Grid-Connected |
| Power | 2196 kWp |
| Solar Modules | 9657 Hareon TRITEC HR-225W Poly |
| Inverters | Danfoss (Roseto&Pineto), Sunways (Atri) |
| Energy yield | 2'964'600 kWh/year |
| CO2-savings | 1434 tons/year |
| Commissioning | 08/2011 |
| Distributor | TRITEC International AG |
| Planner | TRITEC International AG |
| Installer | TRITEC International AG |
| Operator | Suni-1 s.r.l. |
Project Abruzzo Pineto
Italy has high irradiation levels and the feed-in tariff offers interesting returns for investors. The 2’196 kWp green field projects are completely built have been grid connected by the end of August 2011. The projects are located approx. 10 km off the coast in the region of Pineto (approx. 20 km north from Pecsara). All three plants are equipped with 225 Wp poly crystalline modules from Hareon Solar, one of the leading internationally recognized and bankable suppliers of PV modules. For the projects Roseto and Pineto three phase string inverters from Danfoss have been installed. For the project Atri three phased string inverters from Sunways have been installed. For the 450 kW project Atri string inverters from Sunways have been installed.The mounting system consists of galvanized steel poles and an aluminum profiles for module installation. DC cable ways are inside of the aluminum profiles. The steel poles have been rammed into the ground.


