Project Abruzzo Pineto

Roseto, Pineto, Atri, Italy


Fact Sheet
System type Freiland, Grid-Connected
Power 2196 kWp
Solar Modules 9657 Hareon TRITEC HR-225W Poly
Inverters Danfoss (Roseto&Pineto), Sunways (Atri)
Energy yieldá 2'964'600 kWh/year
CO2-savings 1434 tons/year
Commissioning 08/2011
Distributor TRITEC International AG
Planner TRITEC International AG
Installer TRITEC International AG
Operator Suni-1 s.r.l.

Project Abruzzo Pineto

Italy has high irradiation levels and the feed-in tariff offers interesting returns for investors. The 2ĺ196 kWp green field projects are completely built have been grid connected by the end of August 2011. The projects are located approx. 10 km off the coast in the region of Pineto (approx. 20 km north from Pecsara). All three plants are equipped with 225 Wp poly crystalline modules from Hareon Solar, one of the leading internationally recognized and bankable suppliers of PV modules. For the projects Roseto and Pineto three phase string inverters from Danfoss have been installed. For the project Atri three phased string inverters from Sunways have been installed. For the 450 kW project Atri string inverters from Sunways have been installed.The mounting system consists of galvanized steel poles and an aluminum profiles for module installation. DC cable ways are inside of the aluminum profiles. The steel poles have been rammed into the ground.