Project Mutina Modena
Modena, Italy
| Fact Sheet | |
|---|---|
| System type | On-Roof, Grid-Connected |
| Power | 950 kWp |
| Solar Modules | 4222 Hareon TRITEC HR-225W Poly |
| Inverters | 2 Kaco Powador 500 |
| Mounting Systems | TRI-VENT |
| Energy yield | 1'083'410 kWh/year |
| CO2-savings | 909 tons/year |
| Commissioning | 07/2011 |
| Distributor | TRITEC International AG |
| Planner | TRITEC International AG |
| Installer | Solar Ebner |
| Operator | Mutina S.r.l. |
Project Mutina Modena
Italy has high irradiation levels and the feed-in tariff offers interesting returns for investors. The 950 kWp roof top project is already completely built and grid connected since July 2011. The system is mounted on caravan garages of a camping co-operative society that were built in 2007. The projects are located in northern Italy, approx. 20 km outside of Modena in the region Emilia-Romagna. All three plants are equipped with 225 Wp poly crystalline modules from Hareon Solar, one of the leading internationally recognized and bankable suppliers of PV modules. The project is equipped with two Powador 500 Kilowatt-Stations from KACO. They deliver the highest possible output, efficiency and reliability of the KACO new energy central inverters with a cumulative AC rated power of 500 kVA. The development of the TRI?VENT mounting system particularly emphasized great flexibility, good installation features and great safety. The system was specifically designed for the installation of solar systems on trapezoidal sheet roofs and combines the above benefits into a professional solution.

