Alteno Contracting AG

Basel, Switzerland


Fact Sheet
System type On-Roofsystem, Grid-Connected
Power 49.14 kWp
Solar Modules 234 Kyocera KD210GH-2PU
Inverters 9 SolarMax 6000S
Mounting Systems TRI-STAND Schräg- und Flachdach
Energy yield  46'683 kWh/year
CO2-savings 23.34 tons/year
Commissioning 12/2009
Distributor TRITEC International AG
Planner Elektro Roth Kerzers AG
Installer Alteno Contracting AG
Operator Alteno Contracting AG

Alteno Contracting AG

The system was installed on the flat and pitched roof of Alteno Contracting AG in Basel. It has an annual energy yield of 46,683 kWh, corresponding to a CO2 saving of 49.14 tons. The field of solar cells consists of a total of 234 solar modules, divided into three three-phase groups with three systems each.