deutsch | english (UK) | english (global) | franšais | italiano | espa˝ol

Sports Hall St. Leonard

Fribourg, Switzerland


Fact Sheet
System type On-Roof, Exteriors, Grid-Connected
Power 418.32 kWp
Solar Modules 1992 Kyocera KD210GH-2PU
Inverters SolarMax 35S
Mounting Systems TRI-STAND
Energy yieldá 379'000 kWh/year
CO2-savings 189 tons/year
Commissioning 04/2010
Distributor TRITEC International AG
Planner TRITEC AG, Schweiz
Installer Groupe E Connect SA
Operator Groupe E Connect SA

Sports Hall St. Leonard

As prime contractor, TRITEC AG | Switzerland supplied the 418.32 kWp photovoltaic system, Centrale photovolta´que de site sportif de St. LÚonard, and carried out all engineering and planning work. The startup was then realised by the clients themselves.