Sports Hall St. Leonard

Fribourg, Switzerland


Fact Sheet
System type On-Roof, Exteriors, Grid-Connected
Power 418.32 kWp
Solar Modules 1992 Kyocera KD210GH-2PU
Inverters SolarMax 35S
Mounting Systems TRI-STAND
Energy yield  379'000 kWh/year
CO2-savings 189 tons/year
Commissioning April 2010
Distributor TRITEC International AG
Planner TRITEC AG, Schweiz
Installer Groupe E Connect SA
Operator Groupe E Connect SA

Sports Hall St. Leonard

As prime contractor, TRITEC AG | Switzerland supplied the 418.32 kWp photovoltaic system, Centrale photovoltaïque de site sportif de St. Léonard, and carried out all engineering and planning work. The startup was then realised by the clients themselves.